Baker County, Florida — Interconnection Projects

The interXdata warehouse tracks 12 interconnection projects in Baker, Florida, representing 820 MW of requested capacity.

12Total projects
2Active
8Operational
2Withdrawn
820 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar12820 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
FL Queue Project 375 — Solar in Baker, Florida375Solar74.5 MWoperationalBaker, Florida
FL Queue Project 344 — Solar in Baker, Florida344Solar74.5 MWoperationalBaker, Florida
Cedar Trail67672_1Solar74.5 MWoperationalBaker, Florida
Nature Trail65924_1Solar74.5 MWoperationalBaker, Florida
FL Queue Project 376 — Solar in Baker, Florida376Solar74.5 MWactiveBaker, Florida
Maple Trail68836_1Solar74.5 MWactiveBaker, Florida
Southeast Queue Project 300 — Solar in Baker, Florida300Solar74.5 MWoperationalBaker, Florida
Egret Solar Center62925_1Solar74.5 MWoperationalBaker, Florida
FL Queue Project 374 — Solar in Baker, Florida374Solar74.5 MWoperationalBaker, Florida
Northern Preserve Solar62645_1Solar74.5 MWoperationalBaker, Florida
FL Queue Project 212 — Solar in Baker, Florida212Solar60.0 MWwithdrawnBaker, Florida
FL Queue Project 421 — Solar in Baker, Florida421Solar14.5 MWwithdrawnBaker, Florida

Top developers

Developer (canonical)ProjectsCapacity
FPL174 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); fpl-oasis; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Baker County.

Start tracking with interXdata