FL Queue Project 416 — Gas in Lee, Florida
FL Queue Project 416 — Gas in Lee, Florida is a 42.0 MW gas interconnection project in Lee, Florida with a current status of operational. It is proposed to connect at Fort Myers Sub.
42.0 MWCapacity
OperationalStatus
FLMarket
GasTechnology
Project facts
| Canonical name | FL Queue Project 416 — Gas in Lee, Florida |
|---|---|
| Queue ID | 416 |
| Status | operational |
| Source status | In-Service |
| Market | FL |
| Technology | Gas |
| Capacity | 42.0 MW |
| State | Florida |
| County | Lee |
| Point of interconnection | Fort Myers Sub |
| Requested (queue) date | 2020-09-18 |
| Proposed in-service date | — |
| Operational date | 2024-05-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Florida Power & Light |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata