Lee County, Florida — Interconnection Projects

The interXdata warehouse tracks 17 interconnection projects in Lee, Florida, representing 2,782 MW of requested capacity.

17Total projects
0Active
17Operational
0Withdrawn
2,782 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas132,599 MW
Other4183 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Fort Myers612_ST2Gas436.1 MWoperationalLee, Florida
Fort Myers612_PFM3CGas229.5 MWoperationalLee, Florida
Fort Myers612_PFM3DGas229.5 MWoperationalLee, Florida
Fort Myers612_CT2Gas188.2 MWoperationalLee, Florida
Fort Myers612_2BGas188.2 MWoperationalLee, Florida
Fort Myers612_2CGas188.2 MWoperationalLee, Florida
Fort Myers612_2EGas188.2 MWoperationalLee, Florida
Fort Myers612_2DGas188.2 MWoperationalLee, Florida
Fort Myers612_CT1Gas188.2 MWoperationalLee, Florida
Fort Myers612_2FGas188.2 MWoperationalLee, Florida
Fort Myers612_2AGas188.2 MWoperationalLee, Florida
Fort Myers612_ST1Gas156.2 MWoperationalLee, Florida
Fort Myers612_GT1Other62.0 MWoperationalLee, Florida
Fort Myers612_9Other62.0 MWoperationalLee, Florida
FL Queue Project 416 — Gas in Lee, Florida416Gas42.0 MWoperationalLee, Florida
Lee County Solid Waste Energy52010_GEN1Other39.0 MWoperationalLee, Florida
Lee County Solid Waste Energy52010_GEN2Other20.0 MWoperationalLee, Florida

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Lee County.

Start tracking with interXdata