FL Queue Project 421 — Solar in Baker, Florida
FL Queue Project 421 — Solar in Baker, Florida is a 14.5 MW solar interconnection project in Baker, Florida with a current status of withdrawn. It is proposed to connect at Raven-Macedonia (GTC) 115kV.
14.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | FL Queue Project 421 — Solar in Baker, Florida |
|---|---|
| Queue ID | 421 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | FL |
| Technology | Solar |
| Capacity | 14.5 MW |
| State | Florida |
| County | Baker |
| Point of interconnection | Raven-Macedonia (GTC) 115kV |
| Requested (queue) date | 2021-03-31 |
| Proposed in-service date | 2025-10-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Florida Power & Light |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata