FL Queue Project 471 — Solar in Desoto, Florida

FL Queue Project 471 — Solar in Desoto, Florida is a 74.5 MW solar interconnection project in Desoto, Florida with a current status of active. It is proposed to connect at Whidden Sub.

74.5 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 471 — Solar in Desoto, Florida
Queue ID471
Statusactive
Source statusIn Queue
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyDesoto
Point of interconnectionWhidden Sub
Requested (queue) date2022-07-20
Proposed in-service date2029-01-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata