FL Queue Project 57 — Solar in Hillsborough, Florida

FL Queue Project 57 — Solar in Hillsborough, Florida is a 74.5 MW solar interconnection project in Hillsborough, Florida with a current status of withdrawn. It is proposed to connect at Big Bend Substation, Hillsborough County, Florida.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 57 — Solar in Hillsborough, Florida
Queue ID57
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyHillsborough
Point of interconnectionBig Bend Substation, Hillsborough County, Florida
Requested (queue) date2019-04-22
Proposed in-service date2021-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.