FL Queue Project 605 — Solar in Desoto, Florida

FL Queue Project 605 — Solar in Desoto, Florida is a 74.9 MW solar interconnection project in Desoto, Florida with a current status of active. It is proposed to connect at Desoto County.

74.9 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 605 — Solar in Desoto, Florida
Queue ID605
Statusactive
Source statusIn Queue
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyDesoto
Point of interconnectionDesoto County
Requested (queue) date2023-12-15
Proposed in-service date2032-01-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: fpl-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata