FL Queue Project 62 — Gas in Hillsborough, Florida

FL Queue Project 62 — Gas in Hillsborough, Florida is a 186.0 MW gas interconnection project in Hillsborough, Florida with a current status of operational. It is proposed to connect at Gannon Substation, Hillsborough County, Florida.

186.0 MWCapacity
OperationalStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 62 — Gas in Hillsborough, Florida
Queue ID62
Statusoperational
Source statusInterconnection Agreement Executed
MarketFL
TechnologyGas
Capacity186.0 MW
StateFlorida
CountyHillsborough
Point of interconnectionGannon Substation, Hillsborough County, Florida
Requested (queue) date2019-08-14
Proposed in-service date
Operational date2023-09-30
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata