FL Queue Project 67 — Gas in Hillsborough, Florida

FL Queue Project 67 — Gas in Hillsborough, Florida is a 115.0 MW gas interconnection project in Hillsborough, Florida with a current status of withdrawn. It is proposed to connect at Tampa Bay Substation, Hillsborough County, Florida.

115.0 MWCapacity
WithdrawnStatus
FLMarket
GasTechnology

Project facts

Canonical nameFL Queue Project 67 — Gas in Hillsborough, Florida
Queue ID67
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologyGas
Capacity115.0 MW
StateFlorida
CountyHillsborough
Point of interconnectionTampa Bay Substation, Hillsborough County, Florida
Requested (queue) date2020-02-27
Proposed in-service date2022-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata