FL Queue Project 76 — Solar in Polk, Florida

FL Queue Project 76 — Solar in Polk, Florida is a 55.0 MW solar interconnection project in Polk, Florida with a current status of active. It is proposed to connect at Pebbledale Substation, Polk County, Florida.

55.0 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 76 — Solar in Polk, Florida
Queue ID76
Statusactive
Source statusInterconnection Agreement Executed
MarketFL
TechnologySolar
Capacity55.0 MW
StateFlorida
CountyPolk
Point of interconnectionPebbledale Substation, Polk County, Florida
Requested (queue) date2020-11-30
Proposed in-service date2023-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata