FL Queue Project 86 — Solar in Pasco, Florida
FL Queue Project 86 — Solar in Pasco, Florida is a 74.5 MW solar interconnection project in Pasco, Florida with a current status of withdrawn. It is proposed to connect at Dade City Substation, Pasco County, Florida.
74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | FL Queue Project 86 — Solar in Pasco, Florida |
|---|---|
| Queue ID | 86 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | FL |
| Technology | Solar |
| Capacity | 74.5 MW |
| State | Florida |
| County | Pasco |
| Point of interconnection | Dade City Substation, Pasco County, Florida |
| Requested (queue) date | 2022-04-25 |
| Proposed in-service date | 2024-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tampa Electric Company |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.