FL Queue Project 89 — Battery in Hillsborough, Florida

FL Queue Project 89 — Battery in Hillsborough, Florida is a 15.0 MW battery interconnection project in Hillsborough, Florida with a current status of operational. It is proposed to connect at Dover Solar Substation, Hillsborough County, Florida.

15.0 MWCapacity
OperationalStatus
FLMarket
BatteryTechnology

Project facts

Canonical nameFL Queue Project 89 — Battery in Hillsborough, Florida
Queue ID89
Statusoperational
Source statusInterconnection Agreement Executed
MarketFL
TechnologyBattery
Capacity15.0 MW
StateFlorida
CountyHillsborough
Point of interconnectionDover Solar Substation, Hillsborough County, Florida
Requested (queue) date2022-05-16
Proposed in-service date
Operational date2023-12-01
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata