FL Queue Project 94 — Solar in Hillsborough, Florida is a 74.9 MW solar interconnection project in Hillsborough, Florida with a current status of withdrawn. It is proposed to connect at Aspen Substation, Hillsborough County, Florida.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFL Queue Project 94 — Solar in Hillsborough, Florida
Queue ID94
Statuswithdrawn
Source statusWithdrawn
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyHillsborough
Point of interconnectionAspen Substation, Hillsborough County, Florida
Requested (queue) date2022-11-29
Proposed in-service date2025-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: teco-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.