Flag City Solar (21INR0343)

Flag City Solar is a 165.9 MW solar interconnection project in Jackson, Texas with a current status of withdrawn. It is proposed to connect at tap 138kV 5588 Red Bluff - 5546 Danevang c1.

165.9 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameFlag City Solar
Queue ID21INR0343
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity165.9 MW
StateTexas
CountyJackson
Point of interconnectiontap 138kV 5588 Red Bluff - 5546 Danevang c1
Requested (queue) date2019-05-06
Proposed in-service date2027-12-31
Operational date
Withdrawn date2025-12-17
DeveloperFlag City Solar Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata