Flaherty Tap to Custer 69kV (J1600)

Flaherty Tap to Custer 69kV is a 40.0 MW solar interconnection project in Meade, Kentucky with a current status of withdrawn. It is proposed to connect at Flaherty Tap to Custer 69kV.

40.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameFlaherty Tap to Custer 69kV
Queue IDJ1600
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity40.0 MW
StateKentucky
CountyMeade
Point of interconnectionFlaherty Tap to Custer 69kV
Requested (queue) date2020-06-19
Proposed in-service date2022-10-31
Operational date2022-10-31
Withdrawn date2023-07-17
Developer
Utility / transmission ownerBIG RIVERS ELECTRIC CORPORATION

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.