The interXdata warehouse tracks 3 interconnection projects in Meade, Kentucky, representing 340 MW of requested capacity.

3Total projects
0Active
1Operational
2Withdrawn
340 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2240 MW
Battery1100 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Green River Solar68297_4598Solar200.0 MWoperationalMeade, Kentucky
Meade County 161kV SubstationJ2380Battery100.0 MWwithdrawnMeade, Kentucky
Flaherty Tap to Custer 69kVJ1600Solar40.0 MWwithdrawnMeade, Kentucky

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Meade County.

Start tracking with interXdata