Meade County, Kentucky — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Meade, Kentucky, representing 340 MW of requested capacity.
3Total projects
0Active
1Operational
2Withdrawn
340 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 240 MW |
| Battery | 1 | 100 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Green River Solar | 68297_4598 | Solar | 200.0 MW | operational | Meade, Kentucky |
| Meade County 161kV Substation | J2380 | Battery | 100.0 MW | withdrawn | Meade, Kentucky |
| Flaherty Tap to Custer 69kV | J1600 | Solar | 40.0 MW | withdrawn | Meade, Kentucky |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Meade County.
Start tracking with interXdata