Fluvanna Max Solar SLF (29INR0077)

Fluvanna Max Solar SLF is a 152.7 MW solar interconnection project in Scurry, Texas with a current status of operational. It is proposed to connect at 11305 DERMOTT 345 kV .

152.7 MWCapacity
OperationalStatus
ScurryMarket
SolarTechnology

Project facts

Canonical nameFluvanna Max Solar SLF
Queue ID29INR0077
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketScurry
TechnologySolar
Capacity152.7 MW
StateTexas
CountyScurry
Point of interconnection11305 DERMOTT 345 kV
Requested (queue) date2024-12-19
Proposed in-service date
Operational date2029-09-14
Withdrawn date
DeveloperFluvanna Max Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata