Formosa Increase (19INR0014)

Formosa Increase is a 240.0 MW gas interconnection project in Calhoun, Texas with a current status of operational. It is proposed to connect at 8126 Formosa 138kV.

240.0 MWCapacity
OperationalStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameFormosa Increase
Queue ID19INR0014
Statusoperational
Source statusoperational
MarketERCOT
TechnologyGas
Capacity240.0 MW
StateTexas
CountyCalhoun
Point of interconnection8126 Formosa 138kV
Requested (queue) date2016-09-11
Proposed in-service date2023-01-31
Operational date2023-01-18
Withdrawn date
DeveloperFormosa Plactics Corporation
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata