Forrest City to Wynne S 161 KV Line (J1841)

Forrest City to Wynne S 161 KV Line is a 52.0 MW wind interconnection project in Cross, Arkansas with a current status of withdrawn. It is proposed to connect at Forrest City to Wynne S 161 KV Line.

52.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameForrest City to Wynne S 161 KV Line
Queue IDJ1841
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity52.0 MW
StateArkansas
CountyCross
Point of interconnectionForrest City to Wynne S 161 KV Line
Requested (queue) date2020-06-25
Proposed in-service date2023-06-01
Operational date2023-06-01
Withdrawn date2021-12-08
Developer—
Utility / transmission ownerENTERGY ARKANSAS, LLC EATO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata