FORT MOJAVE SOLAR FARMS 2 (704)

FORT MOJAVE SOLAR FARMS 2 is a 240.0 MW solar interconnection project in San Bernardino, California with a current status of withdrawn. It is proposed to connect at Mojave Generating Station 500 kV bus.

240.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameFORT MOJAVE SOLAR FARMS 2
Queue ID704
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity240.0 MW
StateCalifornia
CountySan Bernardino
Point of interconnectionMojave Generating Station 500 kV bus
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2012-03-12
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.