Fort Myers (612_PFM3C)
Fort Myers is a 229.5 MW gas interconnection project in Lee, Florida with a current status of operational.
229.5 MWCapacity
OperationalStatus
FPLMarket
GasTechnology
Project facts
| Canonical name | Fort Myers |
|---|---|
| Queue ID | 612_PFM3C |
| Status | operational |
| Source status | (OP) Operating |
| Market | FPL |
| Technology | Gas |
| Capacity | 229.5 MW |
| State | Florida |
| County | Lee |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2016-12-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Florida Power & Light |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata