FORT TEJON SOLAR (1628)

FORT TEJON SOLAR is a 300.0 MW solar+battery interconnection project in Los Angeles, California with a current status of withdrawn. It is proposed to connect at Vincent Substation 230kV.

300.0 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameFORT TEJON SOLAR
Queue ID1628
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity300.0 MW
StateCalifornia
CountyLos Angeles
Point of interconnectionVincent Substation 230kV
Requested (queue) date2019-04-15
Proposed in-service date
Operational date
Withdrawn date2021-05-05
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata