Fort Thompson-Oahe 230kV (GEN-2018-129)

Fort Thompson-Oahe 230kV is a 200.2 MW wind interconnection project in Hyde/Hughes, South Dakota with a current status of withdrawn. It is proposed to connect at Fort Thompson-Oahe 230kV.

200.2 MWCapacity
WithdrawnStatus
SDMarket
WindTechnology

Project facts

Canonical nameFort Thompson-Oahe 230kV
Queue IDGEN-2018-129
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologyWind
Capacity200.2 MW
StateSouth Dakota
CountyHyde/Hughes
Point of interconnectionFort Thompson-Oahe 230kV
Requested (queue) date2018-11-19
Proposed in-service date2026-10-01
Operational date
Withdrawn date2022-12-15
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata