Fortissimo BESS (25INR0190)

Fortissimo BESS is a 202.7 MW other interconnection project in Montague, Texas with a current status of operational. It is proposed to connect at 741 Dyemound 138kV.

202.7 MWCapacity
OperationalStatus
MontagueMarket
OtherTechnology

Project facts

Canonical nameFortissimo BESS
Queue ID25INR0190
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketMontague
TechnologyOther
Capacity202.7 MW
StateTexas
CountyMontague
Point of interconnection741 Dyemound 138kV
Requested (queue) date2022-10-18
Proposed in-service date
Operational date2028-04-24
Withdrawn date
DeveloperFortissimo BESS, LCC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.