Montague County, Texas — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Montague, Texas, representing 1,007 MW of requested capacity.

5Total projects
0Active
3Operational
0Withdrawn
1,007 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other2513 MW
Solar2462 MW
Battery132 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Prairie Branch BESS28INR0423Other310.2 MWoperationalMontague, Texas
Prairie Branch Solar28INR0422Solar301.2 MWoperationalMontague, Texas
Fortissimo BESS25INR0190Other202.7 MWoperationalMontague, Texas
Weathervane Solar SLF26INR0138Solar160.5 MWsuspendedMontague, Texas
Weathervane Storage SLF26INR0139Battery32.5 MWsuspendedMontague, Texas

Top developers

Developer (canonical)ProjectsCapacity
Prairie Branch Energy, LLC2611 MW
Fortissimo BESS, LCC1203 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Montague County.

Start tracking with interXdata