Montague County, Texas — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Montague, Texas, representing 1,007 MW of requested capacity.
5Total projects
0Active
3Operational
0Withdrawn
1,007 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 2 | 513 MW |
| Solar | 2 | 462 MW |
| Battery | 1 | 32 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Prairie Branch BESS | 28INR0423 | Other | 310.2 MW | operational | Montague, Texas |
| Prairie Branch Solar | 28INR0422 | Solar | 301.2 MW | operational | Montague, Texas |
| Fortissimo BESS | 25INR0190 | Other | 202.7 MW | operational | Montague, Texas |
| Weathervane Solar SLF | 26INR0138 | Solar | 160.5 MW | suspended | Montague, Texas |
| Weathervane Storage SLF | 26INR0139 | Battery | 32.5 MW | suspended | Montague, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Prairie Branch Energy, LLC | 2 | 611 MW |
| Fortissimo BESS, LCC | 1 | 203 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Montague County.
Start tracking with interXdata