Franklin-Emerald 25 kV (AD2-002)

Franklin-Emerald 25 kV is a 20.0 MW gas interconnection project in Greene, Pennsylvania with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameFranklin-Emerald 25 kV
Queue IDAD2-002
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity20.0 MW
StatePennsylvania
CountyGreene
Point of interconnection
Requested (queue) date2017-10-17
Proposed in-service date2022-12-31
Operational date
Withdrawn date2020-12-30
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata