Fresh Air Energy II, LLC (018718)

Fresh Air Energy II, LLC is a 70.0 MW solar interconnection project in Jefferson, Florida with a current status of withdrawn. It is proposed to connect at Drifton Substation.

70.0 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFresh Air Energy II, LLC
Queue ID018718
Statuswithdrawn
Source statusWithdrawn 12/31/2021 mm ae tr erc i Da el lO lp ape er ra dat tio ion -
MarketFL
TechnologySolar
Capacity70.0 MW
StateFlorida
CountyJefferson
Point of interconnectionDrifton Substation
Requested (queue) date2017-05-09
Proposed in-service date
Operational date
Withdrawn date
DeveloperFresh Air Energy II, LLC
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata