Fresh Air Energy II, LLC Flo Pr aid ra R ee rsn ,e Lw La Cble (024909)

Fresh Air Energy II, LLC Flo Pr aid ra R ee rsn ,e Lw La Cble is a 74.5 MW solar interconnection project in Taylor, Florida with a current status of withdrawn. It is proposed to connect at Perry Substation.

74.5 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical nameFresh Air Energy II, LLC Flo Pr aid ra R ee rsn ,e Lw La Cble
Queue ID024909
Statuswithdrawn
Source statusWithdrawn 12/31/2021 Im esp tua dct Study -
MarketFL
TechnologySolar
Capacity74.5 MW
StateFlorida
CountyTaylor
Point of interconnectionPerry Substation
Requested (queue) date2018-08-07
Proposed in-service date
Operational date
Withdrawn date
DeveloperFresh Air Energy II, LLC
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata