Frio Flat Wind (21INR0305)

Frio Flat Wind is a 305.0 MW wind interconnection project in Deaf Smith, Texas with a current status of withdrawn. It is proposed to connect at Tap 345kV 23910 Windmill - 23906 AJSWOPE.

305.0 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameFrio Flat Wind
Queue ID21INR0305
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity305.0 MW
StateTexas
CountyDeaf Smith
Point of interconnectionTap 345kV 23910 Windmill - 23906 AJSWOPE
Requested (queue) date2019-06-16
Proposed in-service date2022-12-15
Operational date
Withdrawn date2021-12-29
DeveloperPhoenix Wind, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.