Fuller Substation 230 (CSU-2023-002)

Fuller Substation 230 is a 100.0 MW battery interconnection project in El Paso, Colorado with a current status of operational. It is proposed to connect at Fuller Substation 230.

100.0 MWCapacity
OperationalStatus
COMarket
BatteryTechnology

Project facts

Canonical nameFuller Substation 230
Queue IDCSU-2023-002
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketCO
TechnologyBattery
Capacity100.0 MW
StateColorado
CountyEl Paso
Point of interconnectionFuller Substation 230
Requested (queue) date2023-04-21
Proposed in-service date
Operational date2025-07-01
Withdrawn date
Developer
Utility / transmission ownerCSU

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata