CSU — Interconnection Queue Projects

CSU is associated with 10 tracked interconnection projects representing 1,925 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

10Projects
1Active
9Operational
0Withdrawn
1,925 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas2590 MW
Solar4535 MW
Wind1500 MW
Battery3300 MW

Geographic footprint

StateProjects
Colorado10

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Williams Creek Substation 230CSUT-2025-1Wind500.0 MWoperationalLincoln, Colorado
Horizon Substation 230CSUT-2025-7Gas412.0 MWoperationalEl Paso, Colorado
Williams Creek Substation 230CSU-2020-3Solar200.0 MWactiveEl Paso, Colorado
South Plant Substation 115CSU-2020-002Gas178.0 MWoperationalEl Paso, Colorado
Williams Creek Substation 230CSU-2020-001Solar175.0 MWoperationalEl Paso, Colorado
South Plant Substation 115 via 34.5 FeedersCSUT-2025-6Battery100.0 MWoperationalEl Paso, Colorado
Nixon Substation 230CSUT-2025-2Solar100.0 MWoperationalEl Paso, Colorado
Horizon Substation 230CSUT-2025-8Battery100.0 MWoperationalEl Paso, Colorado
Fuller Substation 230CSU-2023-002Battery100.0 MWoperationalEl Paso, Colorado
Williams Creek Substation 230CSU-2018-001Solar60.0 MWoperationalEl Paso, Colorado

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through CSU.

Start tracking with interXdata