Funston Solar (67359_4666)

Funston Solar is a 350.0 MW solar interconnection project in Jones, Texas with a current status of active.

350.0 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameFunston Solar
Queue ID67359_4666
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketERCO
TechnologySolar
Capacity350.0 MW
StateTexas
CountyJones
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerFunston Solar LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata