Funston Solar (29INR0015)

Funston Solar is a 351.1 MW solar interconnection project in Jones, Texas with a current status of operational. It is proposed to connect at tap 345 kV 68000 West Shackelford – 68004 Phantom Hill Circuit 2.

351.1 MWCapacity
OperationalStatus
JonesMarket
SolarTechnology

Project facts

Canonical nameFunston Solar
Queue ID29INR0015
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketJones
TechnologySolar
Capacity351.1 MW
StateTexas
CountyJones
Point of interconnectiontap 345 kV 68000 West Shackelford – 68004 Phantom Hill Circuit 2
Requested (queue) date2024-02-27
Proposed in-service date
Operational date2027-07-01
Withdrawn date
DeveloperFunston Solar LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata