Galloway 2 Solar Farm (63343_GS2SF)

Galloway 2 Solar Farm is a 110.0 MW solar interconnection project in Concho, Texas with a current status of operational.

110.0 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameGalloway 2 Solar Farm
Queue ID63343_GS2SF
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity110.0 MW
StateTexas
CountyConcho
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-10-01
Withdrawn date
Developer
Utility / transmission owner224WB 8me LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata