Concho County, Texas — Interconnection Projects

The interXdata warehouse tracks 22 interconnection projects in Concho, Texas, representing 5,214 MW of requested capacity.

22Total projects
4Active
16Operational
1Withdrawn
5,214 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar102,517 MW
Wind51,280 MW
Other41,061 MW
Battery2206 MW
Solar+Battery1150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Operation Sunshine26INR0255Solar603.2 MWoperationalConcho, Texas
Maverick Creek Wind62853_MVRCKWind491.6 MWoperationalConcho, Texas
Operation Sunshine Storage26INR0357Other409.8 MWoperationalConcho, Texas
Paint Rock Wind27INR0108Other379.2 MWoperationalConcho, Texas
Maverick Creek I Wind20INR0045Wind373.2 MWoperationalConcho, Texas
Lucy Solar25INR0225Solar352.2 MWoperationalConcho, Texas
Lucy Solar70200_64205Solar351.3 MWactiveConcho, Texas
Galloway Solar19INR0121Solar250.0 MWoperationalConcho, Texas
Galloway 1 Solar Farm61920_GSM01Solar250.0 MWoperationalConcho, Texas
Concho Pearl Solar and Storage67956_CONPVSolar171.9 MWactiveConcho, Texas
Concho Pearl Solar25INR0174Solar171.9 MWoperationalConcho, Texas
Concho Pearl Solar and Storage67956_CONBSBattery162.4 MWactiveConcho, Texas
Concho Pearl Storage25INR0175Other162.4 MWoperationalConcho, Texas
Cherry Sage Storage 1 SLF28INR0359Solar+Battery150.3 MWactiveConcho, Texas
Cactus Flats Wind16INR0086Wind148.4 MWoperationalConcho, Texas
Cactus Flats Wind Energy Project61001_WT1Wind148.4 MWoperationalConcho, Texas
Cherry Sage Solar 1 SLF28INR0358Solar142.5 MWoperationalConcho, Texas
Maverick Creek II Wind20INR0046Wind118.8 MWoperationalConcho, Texas
Galloway 2 Solar21INR0431Solar113.9 MWoperationalConcho, Texas
Galloway 2 Storage21INR0411Other110.0 MWwithdrawnConcho, Texas
Galloway 2 Solar Farm63343_GS2SFSolar110.0 MWoperationalConcho, Texas
Old Sorrell Energy Storage25INR0459Battery43.1 MWsuspendedConcho, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Concho County.

Start tracking with interXdata