Garnet Solar (20INR0021)

Garnet Solar is a 20.0 MW solar interconnection project in Williamson, Texas with a current status of withdrawn. It is proposed to connect at tap 69kV 3648 Granger - 3649 Taylor.

20.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameGarnet Solar
Queue ID20INR0021
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity20.0 MW
StateTexas
CountyWilliamson
Point of interconnectiontap 69kV 3648 Granger - 3649 Taylor
Requested (queue) date2017-08-09
Proposed in-service date2023-12-31
Operational date
Withdrawn date2021-08-19
DeveloperInnovative Solar 245, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.