Gemini Solar Hybrid (63352_ARPV1)

Gemini Solar Hybrid is a 380.0 MW battery interconnection project in Clark, Nevada with a current status of operational.

380.0 MWCapacity
OperationalStatus
NEVPMarket
BatteryTechnology

Project facts

Canonical nameGemini Solar Hybrid
Queue ID63352_ARPV1
Statusoperational
Source status(OP) Operating
MarketNEVP
TechnologyBattery
Capacity380.0 MW
StateNevada
CountyClark
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2024-03-01
Withdrawn date
Developer
Utility / transmission ownerGemini Community Solar

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.