Gemini Community Solar is associated with 5 tracked interconnection projects representing 1,073 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 3 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

5Projects
0Active
5Operational
0Withdrawn
1,073 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar4693 MW
Battery1380 MW

Portfolio by market

MarketProjects
MISO3

Geographic footprint

StateProjects
Minnesota3
Nevada2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Gemini Solar Hybrid63352_ARBE1Solar690.0 MWoperationalClark, Nevada
Gemini Solar Hybrid63352_ARPV1Battery380.0 MWoperationalClark, Nevada
Gemini Community Solar60940_LGCS2Solar1.0 MWoperationalWashington, Minnesota
Gemini Community Solar60940_LGCS3Solar1.0 MWoperationalWashington, Minnesota
Gemini Community Solar60940_LGCS1Solar1.0 MWoperationalWashington, Minnesota

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Gemini Community Solar.

Start tracking with interXdata