GEN-2007-011N02 (GEN-2007-011N02)

GEN-2007-011N02 is a 600.0 MW other interconnection project in Lancaster County, Nebraska with a current status of withdrawn.

600.0 MWCapacity
WithdrawnStatus
NEMarket
OtherTechnology

Project facts

Canonical nameGEN-2007-011N02
Queue IDGEN-2007-011N02
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyOther
Capacity600.0 MW
StateNebraska
CountyLancaster County
Point of interconnection
Requested (queue) date2007-03-09
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata