GEN-2007-031 (GEN-2007-031)

GEN-2007-031 is a 51.0 MW wind interconnection project in Lubbock County, Texas with a current status of withdrawn.

51.0 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameGEN-2007-031
Queue IDGEN-2007-031
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity51.0 MW
StateTexas
CountyLubbock County
Point of interconnection
Requested (queue) date2007-07-20
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.