Gentleman – Red Willow 345kV Line Break is a 550.0 MW solar interconnection project in Banner, Nebraska with a current status of withdrawn. It is proposed to connect at Gentleman – Red Willow 345kV Line Break.

550.0 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameGentleman – Red Willow 345kV Line Break
Queue IDGEN-2018-045
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity550.0 MW
StateNebraska
CountyBanner
Point of interconnectionGentleman – Red Willow 345kV Line Break
Requested (queue) date2018-05-29
Proposed in-service date2021-12-31
Operational date
Withdrawn date2022-08-10
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.