Georgia Power IC-216 (IC-216)

Georgia Power IC-216 is a 1,200.0 MW gas interconnection project in Early County, Georgia with a current status of withdrawn. It is proposed to connect at Farley - Raccoon Creek 500 kV line.

1,200.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-216
Queue IDIC-216
Statuswithdrawn
Source status
MarketGA
TechnologyGas
Capacity1,200.0 MW
StateGeorgia
CountyEarly County
Point of interconnectionFarley - Raccoon Creek 500 kV line
Requested (queue) date2005-07-14
Proposed in-service date
Operational date
Withdrawn date2006-05-12
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata