GEYSERS UNIT 11 RECONNECTION (1104)

GEYSERS UNIT 11 RECONNECTION is a 74.0 MW gas interconnection project in Sonoma, California with a current status of withdrawn. It is proposed to connect at Geysers 17-Fulton 230kV transmission line.

74.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameGEYSERS UNIT 11 RECONNECTION
Queue ID1104
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity74.0 MW
StateCalifornia
CountySonoma
Point of interconnectionGeysers 17-Fulton 230kV transmission line
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2016-02-05
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata