Gibbons Creek TEERP (20INR0308)

Gibbons Creek TEERP is a 420.0 MW coal interconnection project in Grimes, Texas with a current status of withdrawn. It is proposed to connect at 967 Gibbons Creek 345kV_x000D_ .

420.0 MWCapacity
WithdrawnStatus
ERCOTMarket
CoalTechnology

Project facts

Canonical nameGibbons Creek TEERP
Queue ID20INR0308
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyCoal
Capacity420.0 MW
StateTexas
CountyGrimes
Point of interconnection967 Gibbons Creek 345kV_x000D_
Requested (queue) date2020-04-12
Proposed in-service date2020-11-01
Operational date
Withdrawn date2020-10-21
DeveloperTEERP Power Station LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata