Glass Mountain BB Solar 4 (29INR0358)

Glass Mountain BB Solar 4 is a 302.6 MW solar interconnection project in Pecos, Texas with a current status of active. It is proposed to connect at Tap 345kV 6040 Solstice to 38441 Bottlebrush.

302.6 MWCapacity
ActiveStatus
PecosMarket
SolarTechnology

Project facts

Canonical nameGlass Mountain BB Solar 4
Queue ID29INR0358
Statusactive
Source statusSS Started, FIS Started, No IA
MarketPecos
TechnologySolar
Capacity302.6 MW
StateTexas
CountyPecos
Point of interconnectionTap 345kV 6040 Solstice to 38441 Bottlebrush
Requested (queue) date2026-06-11
Proposed in-service date2029-10-01
Operational date
Withdrawn date
DeveloperGlass Mountain Solar, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata