Gold Coin Storage (27INR0366)

Gold Coin Storage is a 73.0 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Tap 138kV 1470 Newport - 616 Carter.

73.0 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameGold Coin Storage
Queue ID27INR0366
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity73.0 MW
State
County
Point of interconnectionTap 138kV 1470 Newport - 616 Carter
Requested (queue) date2024-11-19
Proposed in-service date2027-07-01
Operational date
Withdrawn date
DeveloperGrenergy USA
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata