Grenergy USA — Interconnection Portfolio

Grenergy USA is associated with 8 tracked interconnection projects representing 920 MW of requested capacity.

Entity resolution: this developer rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

8Projects
3Active
3Operational
2Withdrawn
920 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other2354 MW
Battery5323 MW
Solar1243 MW

Portfolio by market

MarketProjects
ERCOT5

Geographic footprint

StateProjects
Texas6

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Brazos Bend Solar SLF29INR0163Solar243.0 MWoperationalMilam, Texas
Brazos Bend Storage SLF29INR0164Other243.0 MWoperationalMilam, Texas
Zodiac Storage27INR0397Battery125.6 MWactiveVal Verde, Texas
Coyote Ridge BESS27INR0432Other111.1 MWoperationalBrown, Texas
Cycle Storage28INR0266Battery104.5 MWwithdrawn
Gold Coin Storage27INR0366Battery73.0 MWwithdrawn
MESQUITE BESS25INR0697Battery9.9 MWactiveCameron, Texas
BESS Stadium25INR0696Battery9.9 MWactiveJim Wells, Texas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Monitor Grenergy USA's portfolio across all markets.

Start tracking with interXdata