Grenergy USA — Interconnection Portfolio

Grenergy USA is associated with 6 tracked interconnection projects representing 434 MW of requested capacity.

Entity resolution: this developer rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

6Projects
3Active
1Operational
2Withdrawn
434 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Battery5323 MW
Other1111 MW

Portfolio by market

MarketProjects
ERCOT5

Geographic footprint

StateProjects
Texas4

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Zodiac Storage27INR0397Battery125.6 MWactiveVal Verde, Texas
Coyote Ridge BESS27INR0432Other111.1 MWoperationalBrown, Texas
Cycle Storage28INR0266Battery104.5 MWwithdrawn—
Gold Coin Storage27INR0366Battery73.0 MWwithdrawn—
MESQUITE BESS25INR0697Battery9.9 MWactiveCameron, Texas
BESS Stadium25INR0696Battery9.9 MWactiveJim Wells, Texas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Monitor Grenergy USA's portfolio across all markets.

Start tracking with interXdata