Goldfinch Storage (26INR0254)

Goldfinch Storage is a 100.4 MW other interconnection project in Van Zandt, Texas with a current status of operational. It is proposed to connect at Tap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch .

100.4 MWCapacity
OperationalStatus
Van ZandtMarket
OtherTechnology

Project facts

Canonical nameGoldfinch Storage
Queue ID26INR0254
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketVan Zandt
TechnologyOther
Capacity100.4 MW
StateTexas
CountyVan Zandt
Point of interconnectionTap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch
Requested (queue) date2023-10-04
Proposed in-service date
Operational date2030-03-31
Withdrawn date
DeveloperBT DJ4M Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.