Van Zandt County, Texas — Interconnection Projects

The interXdata warehouse tracks 16 interconnection projects in Van Zandt, Texas, representing 2,118 MW of requested capacity.

16Total projects
4Active
10Operational
2Withdrawn
2,118 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other6714 MW
Solar6657 MW
Battery3549 MW
Wind1197 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Amador BESS69520_AMDRBBattery220.0 MWactiveVan Zandt, Texas
Sierra Diablo Energy Storage24INR0417Battery203.8 MWactiveVan Zandt, Texas
Wood Fern Wind28INR0274Wind197.3 MWactiveVan Zandt, Texas
Whiskey BESS25INR0253Other153.7 MWoperationalVan Zandt, Texas
Zorro BESS25INR0384Other153.7 MWoperationalVan Zandt, Texas
Goldfinch Solar26INR0253Solar150.8 MWoperationalVan Zandt, Texas
GIRALDA SOLAR26INR0224Solar137.3 MWwithdrawnVan Zandt, Texas
Old Jackson Solar19INR0123Solar129.3 MWwithdrawnVan Zandt, Texas
Benitoite Storage27INR0223Battery125.7 MWactiveVan Zandt, Texas
Caney Creek Solar23INR0045Solar121.0 MWoperationalVan Zandt, Texas
Amador Storage24INR0472Other102.4 MWoperationalVan Zandt, Texas
Edgewood BESS 127INR0317Other102.1 MWoperationalVan Zandt, Texas
Edgewood BESS 227INR0413Other102.1 MWoperationalVan Zandt, Texas
Goldfinch Storage26INR0254Other100.4 MWoperationalVan Zandt, Texas
Kellam Solar20INR0261Solar59.8 MWoperationalVan Zandt, Texas
Kellam Solar62774_BTKELSolar59.0 MWoperationalVan Zandt, Texas

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Van Zandt County.

Start tracking with interXdata