Golinda Solar (21INR0434)

Golinda Solar is a 103.1 MW solar interconnection project in Falls, Texas with a current status of operational. It is proposed to connect at Tap 138kV 3420 Temple Pecan Creek - 3410 Lake Creek.

103.1 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameGolinda Solar
Queue ID21INR0434
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity103.1 MW
StateTexas
CountyFalls
Point of interconnectionTap 138kV 3420 Temple Pecan Creek - 3410 Lake Creek
Requested (queue) date2019-09-22
Proposed in-service date2024-02-27
Operational date2024-02-27
Withdrawn date
DeveloperBPL Sol Solar LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.